Tim has been with Ausenco for over 20 years, and currently leads the Design Solutions team within Ausenco’s Technical Solutions group. Tim is responsible for development/review/audit of overall process plant layouts.
Tim is highly sought after for design management of specialist facilities and provides a wealth of experience in cost effective design, especially for facilities that contain highly corrosive environments. Tim is experienced in coordinating materials of construction test programs, utilising specialist contractors, to ensure correct equipment materials, surface and concrete protection systems are utilised.
Key projects include:
Studies:
- Corani Project, 8.2 Mt/y Pb/Ag/Zn concentrator, Peru; EPC
- Mina Justa Copper Project, 10 Mt/y vat leach + SXEW, Peru; PFS and DFS
- La Arena Project, 6.6 Mt/y copper concentrator, Peru; Technical Report NI 43-101
- Imouraren Uranium Project, AREVA TSU, 5.0 kt/y Uranium Yellowcake, Niger; DFS
- NEAMOX Project, New England Antimony Mines, SB2O3 ,Australia
- RG Gold CIP Project, 5.0 Mt/y, Kazakhstan
- Mina Justa Copper Project, 10 Mt/y oxide vat leach + SXEW, Peru
- Gibraltar GDP3 Project, Taseko, Copper Concentrator, BC, Canada
- Honeymoon Uranium, UraniumOne, U3O8 insitu leach + SX, Australia
- Nui Phao Mining Project, polymetallic (W, Bi, Cu, CaF2), Vietnam
- Gibraltar GDP3 Project, Taseko, Copper Concentrator, BC, Canada
- Sepon Copper Project, 60 kt/y copper cathode EW, Laos
Design:
- RG Gold CIP Project, 5.0 Mt/y, Kazakhstan
- Mina Justa Copper Project, 10 Mt/y oxide vat leach + SXEW, Peru
- Gibraltar GDP3 Project, Taseko, Copper Concentrator, BC, Canada
- Honeymoon Uranium, UraniumOne, U3O8 insitu leach + SX, Australia
- Nui Phao Mining Project, polymetallic (W, Bi, Cu, CaF2),
Commissioning / Operation Support:
- Gibraltar GDP3 Project, Taseko, Copper Concentrator, BC, Canada
- Sepon Copper Project, 60 kt/y copper cathode EW