Abstract
HudBay’s Constancia project is a copper molybdenum concentrator located in southern Peru. In 2010 Ausenco was contracted to perform a feasibility study optimization review which resulted in an improved design with significantly increased throughput capacity at a minimal increase in capital cost.
Construction began in 2012 with commercial operation commencing in May 2015. This paper outlines the process plant design as well as describing the plant’s major equipment selections, start-up and early operations experiences.