Image: Wilpinjong CHPP Expansion: Collaborative approach to deliver project

Minerals & Metals1 min read

Wilpinjong CHPP Expansion: Collaborative approach to deliver project

Location
Mudgee, New South Wales, Australia
Client
Peabody Energy Australia
Timeframe
2011
Commodity
Coal

Expansion of the coal handling and processing plant capacity was required for Peabody’s Wilpinjong coal mine, located near Mudgee, NSW.

The Wilpinjong expansion project featured a collaborative project delivery approach between Peabody and Ausenco offices located in Australia, the United States and China. Utilising a not-to-exceed reimbursable contract model, Chinese delivered fabrication, US based drafting and a local project management and engineering team proved to maximise value for the Project Owner.

The project scope of work included the expansion of the existing 66kV substation and high voltage reticulation to the CHPP expansion. A secondary ROM system featuring a 400 tonne ROM bin, feeder breaker, scalping screen, secondary and tertiary stacker deliver raw coal to a stockpile dedicated to the CPP, while the existing sizing system is free to dedicate to direct shipped coal.

The addition of a fine dense medium circuit has increased the plant capacity from 800t/h to 1,200t/h, and the addition of a 100,000 tonne washed coal stockpile improves storage and flexibility for product shipments.

Achievements

  • Project handover occurred on time and was delivered under budget.
  • 250,000+Delivered safely with man hours LTI free