Image: Hadjret En Nouss Project: Designed a 1,200mw combined cycle power plant

Oil & Gas1 min read

Hadjret En Nouss Project: Designed a 1,200mw combined cycle power plant

Location
Hadjret En Nouss, Algeria
Client
SNC-Lavalin
Timeframe
2008
Commodity
Gas

Ausenco developed the detail design of the Balance of Plant equipment and systems for the 1,227 MW Hadjret En Nouss combined cycle power plant project.

The project consisted of three GE power generating trains each including as major equipment a combustion turbine, a three pressure level heat recovery steam generator, a condensing reheat steam turbine and a common generator rated at 420 MW at generator terminals.

Flue gas from the 250 MW rated combustion turbine is conveyed to a supplemental duct firing heat recovery steam generator to generate superheated steam at the following conditions: HP at 128 bar and 567 °C; IP at 26 bar and 313 °C: LP at 4.3 bar and 310 °C.

The three stage 175 MW single shaft steam turbine, received steam from the heat recovery steam generator (HRSG) at the three pressure levels. Cold reheat steam from the steam turbine high pressure stage is reheated in the HRSG and returned to the steam turbine intermediate-pressure stage. Turbine exhaust steam was condensed in a deaerating condenser.

We designed the balance of plant equipment and systems which included: fuel supply systems, sea water desalination system, demineralised water system, potable water system, cooling and circulating water systems, all auxiliary steam, water and fuel piping systems, compressed air system, civil structures and miscellaneous systems.

We also prepared the technical part of the procurement documentation required to purchase the plant equipment and materials for the project.

Power was generated at 18.5 kV and then stepped up to 400 kV for connection to the Algerian power grid. Auxiliary services were fed at 6.6 KV.