Arrow Energy currently produce gas from fields in south east and central Queensland. With approximately 500 gas wells across these fields, Arrow Energy is able to supply gas to the Townsville (235MW), Daandine (33MW) and Braemar 2 (450MW) power stations, as well as local and industrial users in Townsville, Moranbah and Brisbane.
Ausenco Rylson have assisted Arrow Energy review their requirements in relation to compliance of all electrical installations.
The project is part of an ongoing review to ensure all legal, corporate and other obligations and requirements in regard to electrical safety are understood and addressed by all arms of the business.
Achievements
Through this project Ausenco Rylson assisted Arrow Energy to develop a system that will provide assurance that the electrical installation maintenance is comprehensive and focused on compliance and safety.
It is intended that the project will result in the following benefits:
- Self-certification of electrical work
- Assurance that electrical work is installed and tested to the appropriate standard
- Protection of staff and contractors by confining the responsibility of work carried out
- Allows regulatory authorities to efficiently audit installations for adherence to safety and technical guidelines.