Due to the potential for a significant release of water even in a moderate earthquake, the Greater Vancouver Water District (GVWD) decided to reconstruct the Little Mountain Reservoir with increased capacity and enhanced reliability.
Ausenco as the prime consultant led a comprehensive team, including 12 specialist sub-consultants, to carry out the detailed design and construction management.