Moose River: Performance-based contract enables project financing and drives superior shareholder value
Moose River Consolidated Gold Project
review of literature for financial crime compliance
Moose River Consolidated Gold Project
Bromptonville Biomass Cogeneration Plant
The Yield Stress of mineral pulps is an extremely important parameter and used in pumping studies. The state of aggregation and dispersion of the mineral particles in the slurries alters the values of the yield stress.
Ron Douglas, our EVP Project Delivery, discusses the factors resulting from poor Feasibility Studies that contribute to failure.
Pipelines have been shown to be more economical and less impacting in the environmental sphere than the rail transport for transport of mineral pulps.
Fraser River Cruise Terminal Project
Tubarão Port
Waste-to-Energy Facility
Ausenco Limited (ASX:AAX) today announced it had proceeded to the next phase of work to provide EPCM services for the development of Hudbay Minerals' (TSX.HBX, NYSE: HBX) Rosemont Project near Tucson, Arizona, USA.
RAV Line Alignment and Feasibility Study
Restructuring Production Process at Vincor's 75,000 sq ft Winery
Gateway Pacific Terminal
Atikokan Biomass Conversion Project
El Aouj Iron Ore mine project
Process plant layout optimized
Orlan Platform retrofits
Feasibility Study For Greenfield Marine LPG Terminal
Project Planning and Value Engineering
Hadjret En Nouss Power Plant
SHBAB Pipeline Leak Detection