墨汁 落とし方

Search

  • The long haul: Our 30-year commitment to the first multi-product pipeline in a mountainous region

    Antamina Multi-Product Concentrate Pipeline System

  • Slurry pipeline SCADA system and valve control at 4,300m ASL

    Collahuasi Slurry Pipeline SCADA System

  • Tintaya Copper Mine: Tailings pipeline at 4,100m ASL

    Tintaya Copper Mine Tailings Pipeline System

  • Los Pelambres Project: Copper tailings and concentrate pipeline system

    Los Pelambres Mauro/Quillayes Dam