産後パパ育休 給付金

Search

  • Find a better way to move your material from mine to market.

    An article series uncovering the key considerations in a holistic approach to transportation processes.

  • Supporting our pipeline clients around the world with accurate lab results

    Our lab experts have characterized thousands of slurry samples to understand the slurry characteristics crucial to pipeline projects.

  • Cerro Verde Project: Tailings distribution and water reclaim system

    Cerro Verde Tailings Management Project

  • Pumping foamy slurries – chemical treatment for optimized operation

    Paper presented at the IBP-organised Rio Pipelines 2015 Conference, Rio de Janeiro, Brazil

  • Tintaya Copper Mine: Tailings pipeline at 4,100m ASL

    Tintaya Copper Mine Tailings Pipeline System

  • Tackling the pumping of foaming slurries

    Reducing slurry foam before it arrives at the centrifugal pump suction nozzle in the iron ore processing plant froth flotation circuit improves pumping capacity and efficiency. Find out how.

  • Tampakan Copper-Gold Project: Concentrate and tailings feasibility and route studies

    Tampakan Copper-Gold Project

  • Los Pelambres Project: Copper tailings and concentrate pipeline system

    Los Pelambres Mauro/Quillayes Dam