産後パパ育休 給付金

Search

  • Carrapateena copper mine: Largest copper concentrator built in Australia’s recent history

    Carrapateena Copper Gold Mine

  • Jinfeng Gold BIOX®: First gold project in China by a western entity

    Jinfeng Gold BIOX® Project

  • Martabe Gold: Design overcomes environment challenges

    Martabe Gold Project

  • Tasiast Gold project: Open-pit gold mine in north-western Mauritania

    Increase in gold production

  • Gibraltar Copper: EPCM for a copper-molybdenum separation plant

    Increase in processing capacity to 85,000 t/d

  • Sepon Copper - Innovative and complex copper leaching process

    Sepon Copper - Innovative leaching solutions

  • Dairi lead-zinc project undertaken in mountainous terrain

    Dairi Lead-Zinc Project

  • Sepon Gold: EPCM delivery of 1.25 Mt/y gold processing facility

    Sepon Gold Project

  • Didipio Gold-Copper Project: Complex design solution for processing facility in hilly seismic terrain

    Didipio Gold-Copper Project

  • Cerro Verde Project: Tailings distribution and water reclaim system

    Cerro Verde Tailings Management Project

  • Tintaya Copper Mine: Tailings pipeline at 4,100m ASL

    Tintaya Copper Mine Tailings Pipeline System

  • Tampakan Copper-Gold Project: Concentrate and tailings feasibility and route studies

    Tampakan Copper-Gold Project

  • Los Pelambres Project: Copper tailings and concentrate pipeline system

    Los Pelambres Mauro/Quillayes Dam