silvergoldbull.com

Search

  • Aurizona Gold project: Expansion and restart of a gold operation in Brazil

    Aurizona Gold Project

  • Moose River: Performance-based contract enables project financing and drives superior shareholder value

    Moose River Consolidated Gold Project

  • Chatree Gold: Award winning gold processing facility

    Chatree Gold EPCM Project

  • Goldstrike TCM Leach Project: Successful gold production uses patented thiosulfate processing method

    Goldstrike TCM Leach Project

  • Martabe Gold: Design overcomes environment challenges

    Martabe Gold Project

  • Phu Kham Copper-Gold: Low capital cost concentrator

    Project delivered in demanding terrain

  • Tasiast Gold project: Open-pit gold mine in north-western Mauritania

    Increase in gold production

  • North Mara Gold Project: Gold processing plant delivered ahead of schedule

    North Mara Gold Project

  • Tucano Gold Project: Transition to new Carbon-in-Leach (CIL) facility

    Tucano Gold Project

  • Sabodala Gold: EPCM delivery of Sabodala 2 Mt/y gold mine

    Sabodala Gold Project

  • Ausenco delivers exceptional financial and sustainable outcomes for Ravenswood Gold  

    Designed by our experts, the new Ravenswood Gold processing plant can be operated efficiently across a range of capacities, with 32% lower water and energy intensity.

  • Sepon Gold: EPCM delivery of 1.25 Mt/y gold processing facility

    Sepon Gold Project

  • Didipio Gold-Copper Project: Complex design solution for processing facility in hilly seismic terrain

    Didipio Gold-Copper Project

  • Ernest Henry Mining magnetite recovery base plant

    EHM Magnetite Recovery Base Plant

  • Bendigo Gold: EPCM for first Australian HPGR installation for Hard Rock Mining

    Bendigo Gold EPCM Project

  • Kainantu: EPCM Gold Project completed in remote highlands of PNG

    Kainantu Gold EPCM Project

  • Hidden Valley Gold Project: Success in PNG rainforest

    Hidden Valley Gold Project

  • Ad Duwayhi Gold Project: Program management assistance for Saudi Arabian Gold Plant

    Ad Duwayhi Gold Project

  • Alumbrera Copper-Gold Mine: Pilot test program through to EPC services for concentrator upgrade

    Alumbrera Copper-Gold Mine

  • Ausenco partners with OZ Minerals to deliver at Carrapateena

    AUSENCO, together with joint-venture partner Downer, is partnering with OZ Minerals to deliver a capital and operationally efficient plant on the Carrapateena project. From Australian Mining Review, December 2018

  • Manantial Espejo Project: Completed in a challenging climatic region

    EPCM in mineral-rich Patagonia region of southern Argentina

  • Pierina Gold Mine: Innovative solutions to heap leaching

    Pierina Gold Mine

  • Ausenco-DF alliance signs MOU for EPC delivery of Canadian Gold Project

    Ausenco Limited (ASX: AAX) and its strategic alliance partner, Duro Felguera S.A. (DF) (BMAD: MDF), have executed a Memorandum of Understanding (MOU) with Atlantic Gold Corporation to deliver the Moose River Consolidated gold project (the “Project”) in Nova Scotia, Canada on an Engineering, Procurement and Construction (EPC) basis.

  • Fruta del Norte Project: Underground Gold-Silver Mine with high grade of gold

    Process plant layout optimized

  • Gosowong Gold Extension Project: EPCM project delivered in logistically challenging location

    Gosowong Gold Extension Project

  • Tampakan Copper-Gold Project: Concentrate and tailings feasibility and route studies

    Tampakan Copper-Gold Project

  • Lessons learnt and performance – installing and commissioning an Ausenco carbon reactivation kiln in Africa

    In Proceedings Metplant 2015 pp 163–174 (The Australasian Institute of Mining and Metallurgy: Melbourne).

  • Fast-payback reactivation of carbon from a flotation tails CIL circuit

    Paper presented at the World Gold Conference, South Africa, 2015